2019

M/V Hogeland

Type of work: steel welding and assembly work

Date: 20.05.2019 – 24.05.2019

Scope of work: construction of a new superstructure, bridge assembly

Some photos:

M/V Cabrillo

Type of work: replacement of stern shaft seal

Date: 31.05.2019 – 01.06.2019

Scope of work: preparing the platform necessary to replace the screw shaft seal on the unit. Replacement of the seal. The ship was on the water during the works.

photos:

M/V North Viking

Type of work: repair and maintenance

Date: 14.06.2019 –

Scope of work: overhaul of the auxiliary engine, renovation of the hydraulic cylinder form the excavator, regenaration of the bucket of excavator.

Some photos:

Globia

Type of work: Works after maintenance of the shipowner and the Inspector of the Classification Society

Date: 01.07.2019 – 11.07.2019

Scope of work: replacement of the lower part of the damper with the exit above the main deck, bulwark replacement, replacement of the hull planting, replacement of frames and overflow bulkhead.

Some photos:

Doris K

Type of work: Hull Works after maintenance of the Inspector of the Classification Society

Date: 15.07.2019 – 31.07.2019

Scope of work: replacement of the side planting and stiffenings, replacement of the outer bottom planting, replacement of frames, replacement of the tank top under the cargo dump, assembly and welding of the pipe in the forepeak deck.

Some photos:

Dolphin Heads II

Type of work: Steel works

Date: 01.09.2019 – 30.09.2019

Scope of work: assembly of steel structure elements, opening and closing hatches on the barge.

Some photos:

Drejo II

Type of work: Steel works

Date: 01.09.2019 – 31.09.2019

Scope of work: assembly of steel structure elements.

Some photos:

Paper Star

Type of work: Works after maintenance of the Inspector of the Classification Society

Date: 01.10.2019 – 15.10.2019

Scope of work: replacement of frames and overflow bulkheads in the tank on the side, replacement of the inner bottom, assembly of welding using graft weld.

Some photos:

Darwin

Type of work: preparing the silos

Date: 16.10.2019 – 10.11.2019

Scope of work: cutting steel profiles stiffened, automatic sheet metal welding A2, welding and assembling of the cone and catcher in the cargo hold.

Some photos:

Darwin

Type of work: preparing and making steel exchanges

Date: 20.11.2019 – 10.01.2020

Scope of work: cutting of 17 tons of steel.

Some photos:

M/V North Viking

Type of work: assembly and welding works

Date: 18.11.2019 – 20.12.2019

Scope of work: exchange of sewage tank, excavator engine overhaul, installation of the fire detection system, turbine and main engine repair, repair of bobcat.

Some photos:

2020

Danubia

Type of work: steel exchanges works on M/V Danubia

Date: 31.01.2020 – 17.02.2020

Scope of work: steel exchanges work of 2263 kg

Some photos:

Bingo III

Type of work: welding works on the M/V Bingo III

Date: 19.02.2020 – 29.02.2020

Scope of work: welding works carried out in Greenland.

Some photos:

M/V North Viking

Type of work: steel work

Time: 19.02.2020

Scope of work: welding the holes in the bottom tank